Test Case 11 tests production capacity expansion, including scaling of investment costs and lifetimes. The tables below depict the sets and parameters, respectively. Input, production and conversion costs during all periods amount to $0.6$ for CNG and $0.9$ for GH2. However, there exists no demand for CNG and no production capacity is available in any period. Capacity expansion comes at a unit cost of $0.5$, which is rescaled to $0.1$ per modeled year. Lifetimes of investments are assumed to be 5 years. In combination with the model time steps of five years, investment costs behave like marginalized costs and can be added on top. Prices in 2025 will be $P=0.9+0.1$, since demand is able to justify an investment. However, invested capacities from 2020 should not carry over to 2030, and the inverse demand intercept of 0.99 does not justify additional investments. Hence, prices for GH2 should be $P=0$, $P=1$, $P=0.99$, in 2020, 2025 and 2030 respectively, while there exists no demand for CNG. In addition, production capacity of 1 should be invested in 2020 for CNG, while no investments should be made in 2025 and 2030 as well as for GH2. Tests pass if all these criteria are met, as can be seen from the table below. The figure below depicts a graphical solution.

Sets

Set NameSet Value
$\mathcal{A}$$\{DEU\_to\_DEU\}$
$\mathcal{AC}$$\{(DEU\_to\_DEU, CNG), (DEU\_to\_DEU, GH2)\}$
$\mathcal{C}$$\{CNG,GH2\}$
$\mathcal{DSB}$$\{Block 1\}$
$\mathcal{I}$$\{Natural Gas\}$
$\mathcal{IOB}$$\{Block 1\}$
$\mathcal{M}$$\{OnlyTimeStep\}$
$\mathcal{N}$$\{DEU\}$
$\mathcal{O}$$\{FES\}$
$\mathcal{P}$$\{P\_DEU\}$
$\mathcal{RA}$
$\mathcal{RS}$
$\mathcal{RV}$
$\mathcal{S}$
$\mathcal{T}$$\{T\_DEU\}$
$\mathcal{V}$$\{V\_DEU\}$
$\mathcal{VT}$$\{(CNG,GH2)\}$
$\mathcal{Y}$$\{2020,2025,2030\}$

Parameters

Parametery=2020y=2025y=2030
$\frac{1}{ | \Delta |_{y}}$$0.2$$0.2$$0.2$
${1}^{NC}_{T\_DEU,DEU,CNG}$$0$$0$$0$
$r_{y}$$1$$1$$1$
$d_{OnlyTimeStep}$$1$$1$$1$
$c^{P}_{P\_DEU,CNG,FES,y}$$0.3$$0.3$$0.3$
$c^{\Delta P}_{P\_DEU,CNG,FES,y}$$0.5$$0.5$$0.5$
$fi^{P}_{CNG,Natural Gas,FES}$$1$$1$$1$
$L^{P}_{CNG,FES}$$50$$50$$50$
$\Lambda^{P}_{P\_DEU,CNG,FES,y}$$0$$0$$0$
$c^{P}_{P\_DEU,GH2,FES,y}$$1.3$$1.3$$1.3$
$c^{\Delta P}_{P\_DEU,GH2,FES,y}$$0.5$$0.5$$0.5$
$fi^{P}_{GH2,Natural Gas,FES}$$1$$1$$1$
$L^{P}_{GH2,FES}$$50$$50$$50$
$\Lambda^{P}_{P\_DEU,GH2,FES,y}$$0$$0$$0$
$\Lambda^{I}_{P\_DEU,Natural Gas,Block 1,y}$$10$$10$$10$
$\Omega^{I}_{P\_DEU,Natural Gas,Block 1,y}$$0$$0$$0$
$c^{\Delta^{I}}_{P\_DEU,Natural Gas,Block 1,y}$$0$$0$$0$
$\Lambda^{T}_{T\_DEU,DEU,CNG,FES,y}$$10$$10$$10$
$\Lambda^{T}_{T\_DEU,DEU,GH2,FES,y}$$10$$10$$10$
$\Omega^{P}_{P\_DEU,CNG,FES,y}$$10$$10$$10$
$\Omega^{P}_{P\_DEU,GH2,FES,y}$$10$$10$$10$
$fi^{V}_{CNG,GH2}$$1$$1$$1$
$l^{A}_{DEU\_to\_DEU,CNG}$$0$$0$$0$
$l^{A}_{DEU\_to\_DEU,GH2}$$0$$0$$0$
$c^{V}_{V\_DEU,CNG,GH2,y}$$0.3$$0.3$$0.3$
$c^{\Delta V}_{V\_DEU,CNG,GH2,y}$$10$$10$$10$
$\Lambda^{V}_{V\_DEU,CNG,GH2,y}$$10$$10$$10$
$L^{V}_{CNG,GH2}$$5$$5$$5$
$c^{A}_{DEU\_to\_DEU,CNG,y}$$0$$0$$0$
$c^{\Delta A}_{DEU\_to\_DEU,CNG,y}$$0$$0$$0$
$\Lambda^{A}_{DEU\_to\_DEU,CNG,y}$$0$$0$$0$
$L^{A}_{CNG}$$50$$50$$50$
$c^{A}_{DEU\_to\_DEU,GH2,y}$$0$$0$$0$
$c^{\Delta A}_{DEU\_to\_DEU,GH2,y}$$0$$0$$0$
$\Lambda^{A}_{DEU\_to\_DEU,GH2,y}$$0$$0$$0$
$L^{A}_{GH2}$$50$$50$$50$
$c^{I_{l}}_{P\_DEU,Natural Gas,Block 1,OnlyTimeStep,y}$$0.3$$0.3$$0.3$
$c^{I_{q}}_{P\_DEU,Natural Gas,Block 1,OnlyTimeStep,y}$$0$$0$$0$
$av^{I}_{P\_DEU,Natural Gas,Block 1,OnlyTimeStep}$$1$$1$$1$
$\alpha^{D}_{DEU,CNG,Block 1,OnlyTimeStep,y}$$0$$0$$0$
$\beta^{D}_{DEU,CNG,Block 1,OnlyTimeStep,y}$$-1$$-1$$-1$
$\alpha^{D}_{DEU,GH2,Block 1,OnlyTimeStep,y}$$0$$2$$0.99$
$\beta^{D}_{DEU,GH2,Block 1,OnlyTimeStep,y}$$-1$$-1$$-1$

Test Criteria

ExpressionResult y=2020Result y=2025Result y=2030
$\tilde{P}^{T \rightarrow D}_{DEU,CNG,Block 1,OnlyTimeStep,y}$$0$$0$$0$
$\tilde{P}^{T \rightarrow D}_{DEU,GH2,Block 1,OnlyTimeStep,y}$$0$$1$$0.99$
$\Delta^{P}_{P\_DEU,CNG,FES,y}$$1$$0$$0$
$\Delta^{P}_{P\_DEU,CNG,FES,y}$$0$$0$$0$

Graphical Solution

Marginalized Provision Costs and Prices for Different Time Steps and Commodities

CNG 2020

test_case_11a_graphic

GH2 2020

test_case_11b_graphic

CNG 2025

test_case_11c_graphic

GH2 2025

test_case_11d_graphic

CNG 2030

test_case_11e_graphic

GH2 2030

test_case_11f_graphic